Talk:Samurai: Difference between revisions
Appearance
Created page with "The Cost for Samurai was $2 Million Dollars. - Sid" |
Willenator (talk | contribs) Adding comment & header |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
== Ride Facts List == | |||
The Cost for Samurai was $2 Million Dollars. - Sid | The Cost for Samurai was $2 Million Dollars. - Sid | ||
Ride Model should be "Top Scan". - Sid | |||
Added cost to the facts list. --[[User:Willenator|Willenator]] ([[User talk:Willenator|talk]]) 14:28, 8 April 2015 (MDT) |
Latest revision as of 14:28, 8 April 2015
Ride Facts List
The Cost for Samurai was $2 Million Dollars. - Sid
Ride Model should be "Top Scan". - Sid
Added cost to the facts list. --Willenator (talk) 14:28, 8 April 2015 (MDT)